Warning: include(/usr/www/users/ettech23/includes/top.php) [function.include]: failed to open stream: No such file or directory in /usr/www/users/ettech23/pedestrian_and_trail_bridges/case_studies/index.php on line 12

Warning: include() [function.include]: Failed opening '/usr/www/users/ettech23/includes/top.php' for inclusion (include_path='.:/usr/local/lib/php') in /usr/www/users/ettech23/pedestrian_and_trail_bridges/case_studies/index.php on line 12
E.T. Techtonics

Case Studies

Albion, MI Rails to Trails Project

Rails to Trails projects often need new trail bridges to be constructed off existing railroad bridge structures.

Albion, MI Rails to Trails Project

Hyatt Islandia Pedestrian Bridge

Expansion at the Hyatt Islandia Hotel in downtown San Diego required a new 65’-0” x 6’-0” pedestrian bridge.

Hyatt Islandia Project

Green Hill Park Pedestrian Bridge

The Roanoke County Greenways Commission in Virginia needed a 70’-0” x 8’-0” pedestrian bridge for a stream crossing on their trail.

Green Hill Park Project

Warning: include(/usr/www/users/ettech23/includes/base.php) [function.include]: failed to open stream: No such file or directory in /usr/www/users/ettech23/pedestrian_and_trail_bridges/case_studies/index.php on line 68

Warning: include() [function.include]: Failed opening '/usr/www/users/ettech23/includes/base.php' for inclusion (include_path='.:/usr/local/lib/php') in /usr/www/users/ettech23/pedestrian_and_trail_bridges/case_studies/index.php on line 68